Honda Accord

1998-1999 of release

Repair and operation of the car



Honda Chord
+ Cars of the Honda Accord brand
+ Settings and routine maintenance
+ Engine
+ Cooling systems, heating
+ Power supply system and release
+ Electric equipment of the engine
+ Engine management
- Gear shifting box
   - 5-staged manual box of gear shifting (MBGS)
      Replacement of epiploons of power shafts
      Removal and installation of the drive and lever of gear shifting
      Check and replacement of the sensor switch of fires of a backing
      Removal and RKPP installation
      Capital repairs of RKPP - the general information
   + 4-staged automatic transmission (AT)
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schemes of electric equipment


Рыбалка на Сома

Capital repairs of RKPP - the general information

Authors of the present manual do not recommend to owners of cars to undertake performance of capital repairs of RKPP independently. During performance of procedures of dismantling and assembly of a transmission it is necessary to remove, and then to establish into place a set of small components. It is necessary to perform the mass of the most exact measurements and, by selection of adjusting washers, rings and remote plugs, accurately to expose a set of gaps. In view of all aforesaid, performance of capital repairs of RKPP will be more reasonable to be charged to specialists of car service. Let's notice that in many cases there is an opportunity on an exchange basis to get the restored block that is often cheaper, than carrying out difficult repair.

Despite the told, independent performance of repair of RKPP by the amateur mechanic is not absolutely impossible action at all. Indispensable conditions are only existence of the necessary special tool and accuracy in approach to performance of all procedures.

Nippers for removal of internal and external lock rings, a stripper of bearings, a hammer with sliding brisk, a set of drifts and center punches, the DTI measuring instrument and, perhaps, a hydraulic press are among tools, necessary for performance of recovery repair of RKPP. Besides, of course, the workbench, or the special assembly stand is required strong, equipped with a vice.

During performance of procedures of dismantling of RKPP try to remember, and it is better to write down, an order of installation of each of the removed details.

Before starting dismantling of a transmission, it will be reasonable to try to analyse symptoms of its refusals for the purpose of approximate definition of their reasons. Many refusals are unambiguously connected with failure of quite certain components. See also Section devoted to diagnostics of malfunctions of RKPP at the beginning of the Management.