|
Honda Accord1998-1999 of releaseRepair and operation of the car |
|
Honda Chord + Cars of the Honda Accord brand + Settings and routine maintenance + Engine + Cooling systems, heating - Power supply system and release Dropping pressure in a power supply system Check of serviceability of functioning of the fuel pump, measurement of pressure of fuel Check of a state and replacement of fuel lines Removal and installation of the fuel pump Check of a state and replacement of the sensor Removal and installation of a fuel tank Cleaning and repair of a fuel tank - general information Removal and installation of assembly of the air cleaner Removal, installation and adjustment of a cable of an accelerator System of electronic injection of fuel (EFI) - the general information Check of serviceability of functioning of system of injection Removal and installation of the case of a throttle Removal and installation of the regulator of pressure of fuel Removal and installation of the fuel highway and injectors of fuel System of release - the general information + Electric equipment of the engine + Engine management + gear shifting Box + Coupling and power shafts + Brake system + Suspension bracket and steering + Body + Onboard electric equipment + Schemes of electric equipment |
System of release - the general information
The system of production of the fulfilled gases of all considered models consists of a final collector(s), a reception pipe, the catalytic converter, the muffler, connecting tubular sections, fixing collars, and also basic arms and rubber loops by means of which final assembly is suspended to the car bottom. The wrong installation of components and sections of system leads to increase of level of the noise and vibrations transferred to a car body. Regularly examine all system on existence of traces of corrosion, deformations and mechanical damages. Check reliability of a tightening of fixture. Violation of tightness of components and their joints is fraught with hit of the fulfilled gases in salon of the car. Defective components and sections are subject to replacement. At strong damage of system by corrosion for undocking of its sections the gas cutting torch can be demanded (it is alternatively possible to use a hacksaw or a pneumatic chisel - do not forget to put on goggles and gloves).
d) Before installation grease carving part of fixture with the anti-taking sealant; e) At installation of components watch that between sections of system and nearby elements of a suspension bracket/body there was a sufficient gap. Pay special attention to correctness of installation and reliability of fastening of the thermofilter of the catalytic converter. |
|