Honda Accord

1998-1999 of release

Repair and operation of the car



Honda Chord
+ Cars of the Honda Accord brand
+ Settings and routine maintenance
+ Engine
+ Cooling systems, heating
+ Power supply system and release
+ Electric equipment of the engine
+ Engine management
- Gear shifting box
   + 5-staged manual box of gear shifting (MBGS)
   - 4-staged automatic transmission (AT)
      Problem diagnostics of AT/CVT - the general information
      Removal, installation and adjustment of a cable of gear shifting
      Removal and installation of the lever of switching (selector) of transfers
      System of blocking - the general information, check of a state, replacement and adjustment of an electromagnet of management
      Adjustment and replacement of the sensor switch of provision of transmission
      Check and replacement of electromagnetic valves of management of transmission functioning
      Removal and installation 4-staged and automatic transmission (AT)
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schemes of electric equipment


КРОВЛЯ

Removal, installation and adjustment of a cable of gear shifting

The models of cars considered in the present manual are equipped with system of additional safety (SRS). Before starting performance of any works near the block of a safety cushion, a steering column or the dashboard, disconnect SRS in order to avoid receiving injuries at its casual operation (see the Head Onboard electric equipment). It is easy to distinguish an electrical wiring of a chain of SRS on yellow color of isolation.

REMOVAL

 PERFORMANCE ORDER

1. Remove the central console (see the Head Kuzov).

2. Give a cable regulator lock-nut.
3. Deploy the rubber plug through passage on 1/4 turns counterclockwise and together with a cable release it from a basic arm.

4. The car also establish to Poddomkratta it on props.
5. Under the car remove an exhaust pipe with the thermofilter (see the Head of the Power supply system and release).

6. Under the car, around placement of the console remove the directing arm of a cable and release the rubber plug of the last through passage from the bottom panel.

7. Turn out bolts from the holder of a cable of management of gear shifting.

In order to avoid damage of knot of connection of a cable to a control lever, the holder it is necessary to uncover before.

8. Turn out fixing bolts and uncover a cable of management of switching.

9. Turn out a lock bolt and take a control lever with the switching cable connected to it from transmission assembly.

INSTALLATION

 PERFORMANCE ORDER

1. Under the car pass assembly of a new cable throughout an opening of access and establish into place the directing arm.
2. Transfer the lever of switching (selector) to the situation "R".
3. On transmission connect a control lever with the switching cable attached to it to the operating rod.
4. Screw a new lock bolt of fastening of the lever and record it, having bent a tag of a lock washer.
5. Establish on a cover the holder of a cable of management of switching, then establish assembly of a cover on transmission.
6. In salon of the car deploy the plug through passage on 1/4 turns clockwise and put assembly on a basic arm.
7. Include ignition (do not start the engine) and make sure that the indicator of inclusion of a reverse gear burns.
8. If the cable is established incorrectly, push it forward against the stop, then extend back on one click, having transferred to the situation corresponding to inclusion of a reverse gear.

9. Put on a cable tip a switching lever bolt, having tracked correctness of combination of a groove with rectangular ledges of a bolt.

10. Serially translate the switching lever through all provisions and make sure of serviceability of switching of transmission.
11. Further installation is made as it should be, the return to an order of dismantle of the corresponding components. In case of need make adjustment of a cable of switching

ADJUSTMENT

 PERFORMANCE ORDER

1. Start the engine, transfer the selector lever to the situation "R" and make sure of serviceability of inclusion of a reverse gear. If transfer does not join, it is necessary to make adjustment of a cable. Kill the engine.
2. Remove the central console (see the Head Kuzov).

3. Transfer the selector lever to the situation "N", then release a cable regulator lock-nut.

4. Push a cable forward against the stop, then release it, - transmission has to switch in situation "P". pull a cable back on one click so that it was recorded in the new situation corresponding to the situation "R".
5. Pass a core with a diameter of 6.1 mm throughout a special opening in an assembly bracket of the basis of the lever of switching, - the opening is located from the driver's party of a casing of the lever. After the core is passed throughout an opening in an assembly bracket of the basis of the lever, level the last and pass a core throughout an opening in its basis. Now assembly will be recorded.

6. Put on a cable tip a lever bolt.

7. Screw a lock-nut and record a cable in this situation.
8. Take the core fixing assembly.
9. Start the engine and make sure of serviceability of functioning of assembly of management of gear shifting.