Honda Accord

1998-1999 of release

Repair and operation of the car



Honda Chord
+ Cars of the Honda Accord brand
+ Settings and routine maintenance
+ Engine
- Cooling systems, heating
   Antifreeze - general information
   Check of serviceability of functioning and replacement of the thermostat
   Check of a condition of fans of the cooling system and chains of their inclusion, replacement of fans
   Removal and installation of a radiator and broad tank of the cooling system
   Check of a condition of the water pump
   Replacement of the water pump
   Check of serviceability of functioning and replacement of the block of the sensor of the measuring instrument of temperature of cooling liquid
   Check of serviceability of functioning of a driving electric motor of the fan of a heater and condition of components of its electric chain, replacement of components
   Removal and installation of an electric motor of the drive of the fan of a heater
   Removal and installation of assembly of the control panel functioning of a heater and conditioner of air, adjustment of a driving cable
   Removal and installation of the heat exchanger of a heater
   Check of serviceability of functioning and service of systems of heating and air conditioning
   Check of an electric chain of the coupling of coupling of the K/V compressor
   Removal and installation of a receiver dehumidifier To/in
   Removal and installation of the K/V compressor
   Removal and installation of the K/V condenser
   Removal and installation of the K/V evaporator with the broad valve
+ Power supply system and release
+ Electric equipment of the engine
+ Engine management
+ gear shifting Box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schemes of electric equipment


Каша

Removal and installation of a radiator and broad tank of the cooling system

Do not start performance of procedures before full cooling of the engine. See also prevention at the beginning of the Section Antifreeze - general information.

Broad tank

 PERFORMANCE ORDER

1. The broad tank of the cooling system is located near a radiator in right forward (4-cylinder models) or the right forward (V6 model) corner of a motive compartment (near the battery).

2. Walk on an overflow hose from a radiator mouth to the top part of a broad tank. Uncover together with the hose connected to it. Remove a tank, having pulled it vertically up and having released from a basic arm.

3. Merge cooling liquid from a broad tank in the prepared capacity.
4. Wash out a tank, wipe it outside and check for existence of cracks and other damages. In case of need make replacement. Level of the liquid which is in a tank has to be read easily through translucent walls.
5. Installation is made upside-down.

Radiator

REMOVAL

 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped with a security code before disconnecting the battery make sure that have the correct combination for input of the audio system in action!

2. Cock the parking brake and prop up back wheels antiretractable boots. A car front also establish to Poddomkratta it on props. At the corresponding complete set remove the antispray screen of a radiator.

3. Empty the cooling system (see the Head Nastroyki and routine maintenance). If replacement of cooling liquid was made recently, keep for further use (see the prevention in the Section Antifreeze - general information).

4. On models with AT disconnect from a radiator of the line of a path of cooling of ATF (see an accompanying illustration). Prepare for collecting the spilled liquid, at once a zakuporta the open ends of tubes and unions.

5. Disunite the cooling system fan electrical wiring socket (see the Section Check of a Condition of Fans of the Cooling System and Chains of Their Inclusion; replacement of fans).

6. Release collars and disconnect from a radiator both (top and lower) hoses. If hoses "stuck" to connecting branch pipes, use nippers, or a knife (with the subsequent replacement of hoses). Disconnect also the hose going to a broad tank.

7. Remove fans (see the Section Check of a Condition of Fans of the Cooling System and Chains of Their Inclusion; replacement of fans).

8. Otboltite also remove small arms of fastening of the upper edge of a radiator to the bearing beam.

9. Carefully take a radiator from a motive compartment. Try not to spill cooling liquid on the painted body panels and do not cut fingers about sharp plates of the heat exchanger.
10. After removal from the car the radiator can be checked for existence of signs of leaks, damages and violations of internal passability of the heat exchanger. Any repair has to be made only in the conditions of a specialized workshop with use of the necessary equipment.
11. Remains of insects and vegetation can be removed from space between heat exchanger plates by blowing by compressed air (do not forget to put on goggles!), or cleaning out by a soft brush. Try not to bend thin plates of the heat exchanger and not to cut about them fingers.
12. Check a condition of rubber support of a radiator, in case of need make replacement of the failed components.

INSTALLATION

 PERFORMANCE ORDER

1. Installation is made upside-down. Track correctness of placement of a radiator on the support.
2. On completion of installation fill in in system cooling liquid of the demanded structure (see the Head Nastroyki and routine maintenance), in case of need let out from a path air traffic jams via the special final gate.
3. Start the engine and check it for existence of signs of leaks. Warm up the engine up to the normal working temperature (both hoses of a radiator have to become hot to the touch). Check the level of cooling liquid, in case of need add the corresponding amount of mix.
4. On models with AT check the ATF level, in case of need add.