Honda Accord

1998-1999 of release

Repair and operation of the car



Honda Chord
+ Cars of the Honda Accord brand
+ Settings and routine maintenance
+ Engine
+ Cooling systems, heating
+ Power supply system and release
+ Electric equipment of the engine
+ Engine management
+ gear shifting Box
- Coupling and power shafts
   Coupling - the general information and check of a condition of components
   Removal and installation of the main cylinder of coupling
   Removal and installation of the executive cylinder of coupling
   Removal of air from a hydraulic path of the drive of switching off of coupling
   Removal, check of a state and installation of components of assembly of coupling
   Removal, check of a state and installation of the vyzhimny bearing and fork of switching off of coupling
   Adjustment of a pedal of coupling
   Check of a state, replacement and adjustment of the sensor switch of disconnection of a chain of a starter
   Removal and installation of power shafts
   Removal and installation of an intermediate shaft
   Replacement of protective covers and check of a condition of CV JOINTS
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schemes of electric equipment


Removal and installation of an intermediate shaft

REMOVAL

 PERFORMANCE ORDER

1. Weaken nuts of fastening of the left forward wheel. A car front also establish to Poddomkratta it on props. Remove a wheel.
2. Merge transmission oil (see the Head Nastroyki and routine maintenance).
3. Remove a damping fork and release the lower control lever of a suspension bracket from assembly of a rotary fist (see the Head Podvesk and a steering).
4. Having hooked the lever for a casing, release a pin of the internal CV JOINT from assembly of an intermediate shaft. Take a power shaft aside and tie up it a wire to a suspension bracket element (do not leave a power shaft hanging on the external CV JOINT at all!).

5. Turn out three bolts of fastening of a support of the bearing of an intermediate shaft to the engine block. Take a shaft from transmission, - try not to damage a differential epiploon.

6. Check freedom of rotation of the basic bearing (holding the bearing, rotate a shaft). In case of identification of breakthroughs and points of jamming it is necessary to deliver assembly of a shaft in a workshop of car service as replacement of the bearing is made by means of the special tool.

INSTALLATION

 PERFORMANCE ORDER

1. Grease epiploon sponges in a transmission case with universal greasing. Accurately fill a pin of an intermediate shaft in a nest of a lateral gear wheel of differential. Screw bolts of fastening of a support of the bearing and tighten them with the demanded effort.
2. Establish a new spring lock ring on a pin of the internal CV JOINT of a power shaft, then fill a pin in assembly of an intermediate shaft.
3. Connect the lower lever of a suspension bracket to a rotary fist, tighten with the demanded effort (see Specifications to the Head Podvesk and a steering) a nut of a finger of a spherical support. Establish a damping fork and tighten its fixture with the demanded effort (see Specifications to the Head Podvesk and a steering).
4. Establish a wheel, lower the car on the earth and tighten nuts of fastening of a wheel with the demanded effort (see Specifications to the Head Nastroyki and routine maintenance).
5. Fill in in transmission necessary amount of oil of the demanded grade (see the Head Nastroyki and routine maintenance).