Honda Accord

1998-1999 of release

Repair and operation of the car



Honda Chord
+ Cars of the Honda Accord brand
+ Settings and routine maintenance
+ Engine
+ Cooling systems, heating
+ Power supply system and release
+ Electric equipment of the engine
+ Engine management
+ gear shifting Box
+ Coupling and power shafts
+ Brake system
- Suspension bracket and steering
   Removal and installation of assembly of the forward shock-absorber with a screw spring
   Replacement of the shock-absorber or screw spring of rack-mount assembly
   Removal and installation of a rotary fist
   Removal and installation of assembly of a forward nave with the wheel bearing
   Removal and installation of the forward stabilizer of cross stability
   Removal and installation of the pushing bar of a forward suspension bracket
   Removal and installation of the lower control lever of a forward suspension bracket
   Removal and installation of the top control lever of a forward suspension bracket
   Replacement of spherical support
   Removal and installation of assembly of the back shock-absorber with a screw spring
   Removal and installation of stupichny assembly of a back wheel
   Removal and installation of assembly of a back nave with the wheel bearing
   Removal and installation of a bar of the back stabilizer of cross stability
   Removal and installation of levers of a back suspension bracket
   Removal and installation of a steering wheel
   Removal and installation of tips of steering drafts
   Replacement of protective covers of the steering mechanism
   Removal and installation of rack transfer
   Removal and installation of the steering pump
   Removal of air from a hydraulic path of system of strengthening of a wheel
   Wheels and tires - the general information
   Corners of installation of wheels
+ Body
+ Onboard electric equipment
+ Schemes of electric equipment


Removal and installation of assembly of a back nave with the wheel bearing

The back nave is combined with the wheel bearing in uniform assembly. The bearing is sealed at manufacturer and additional greasing does not need. In case of wear or damage of the bearing it should be replaced assembled with a nave.


 PERFORMANCE ORDER

1. Weaken nuts of fastening of the corresponding back wheel. A car back also establish to Poddomkratta it on props. Remove a wheel.
2. Remove a brake drum / support with a disk (see the Head Brake system).
3. By means of a hammer and a chisel remove a dustproof cover, then a raschekanta a stupichny nut.

4. By means of a face key with a long collar give a stupichny nut.

5. Remove a nave with the wheel bearing which is built in in it from stupichny assembly of the back bridge. If the nave "stuck", tap it a hammer with soft the brisk.

6. Establish new assembly of a nave with the bearing on the regular place. With the demanded effort tighten a new stupichny nut. Do not forget to fuller a nut.

7. Establish into place a dustproof cover, for reliability of landing having slightly tapped it on perimeter.
8. Further installation is made as it should be, the return to an order of dismantle of components. Track that the fixture of components of the brake mechanism was tightened with the demanded effort (see Specifications to the Head Brake system). Efforts of a tightening of wheel nuts are given in Specifications to the Head Nastroyki and routine maintenance.