Honda Accord

1998-1999 of release

Repair and operation of the car



Honda Chord
+ Cars of the Honda Accord brand
+ Settings and routine maintenance
- Engine
   - Four-cylinder engines
      Preparatory actions and the list of repair procedures which can be executed without extraction of the engine from the car
      Reduction of the piston of the first cylinder in the provision of the top dead point (TDP)
      Removal and installation of a cover of a head of cylinders
      VTEC system - the general information and check of a condition of components
      Removal, check of a state and installation of assembly of yokes
      Replacement of maslootrazhatelny caps and valvate springs with plates
      Removal and installation of the inlet pipeline
      Removal and installation of a final collector
      Removal, check of a state and installation of cogwheels and belt of the drive of balancing shaft
      Removal, check of a state and installation of a gas-distributing belt and cogwheels of the GRM drive
      Replacement of a forward epiploon of a cranked shaft
      Removal, check of a state and installation of a camshaft
      Removal and installation of a head of cylinders
      Removal and installation of the pallet of a case of the engine
      Removal, check of a state and installation of the oil pump
      Removal and installation of a flywheel / driving disk
      Replacement of a back epiploon of a cranked shaft
      Check of a state and replacement of support of a suspension bracket of the power unit
      System of correction of a suspension bracket of the power unit - the general information and check of serviceability of functioning
   + V6 Engines
   + General and capital repairs of the engine
+ Cooling systems, heating
+ Power supply system and release
+ Electric equipment of the engine
+ Engine management
+ gear shifting Box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schemes of electric equipment


Фибриноген при беременности

Removal, check of a state and installation of a gas-distributing belt and cogwheels of the GRM drive

REMOVAL

At emergence of the extraneous noises published during the work of a gas-distributing belt first of all check adjustment of its tension. This procedure can be made without removal of forward covers (see paragraph 5 of the Section Removal, check of a state and installation of cogwheels and a belt of the drive of balancing shaft).


 PERFORMANCE ORDER

1. Bring the engine into position VMT of the first cylinder and for the purpose of ensuring access to a gas-distributing belt remove forward covers and a belt of the drive of balancing shaft (see the Section Reduction of the Piston of the First Cylinder in the provision of the top dead point (TDP)).

2. At the weakened nut of a natyazhitel wring out a roller of the last down, then tighten a nut. Now the gas-distributing belt can be thrown off from GRM drive cogwheels.

If the old belt is in good repair and will be established into place, mark with chalk or white paint the direction of its rotation and situation concerning cogwheels of shaft.

3. The camshaft cogwheel can be in case of need removed, - pass a big screw-driver throughout an opening in molding of a wheel, then accurately give a fixing bolt by means of a face key.

Try not to allow camshaft provorachivaniye in the course of an otdavaniye of a bolt of fastening of its cogwheel!

4. Removal of a cogwheel will provide access to two bolts of fastening to a back cover of a belt, and also to a camshaft epiploon.

CHECK

 PERFORMANCE ORDER

Manually check freedom of rotation of a roller of a natyazhitel, then pull it here and there, checking for existence of a side play in the bearing. Check a condition of teeths of wheels of the GRM drive (pay attention to existence of chips, cracks and other mechanical damages). Estimate the size of an axial side play of a camshaft. Attentively examine a gas-distributing belt from both parties, checking it for existence of signs of wear (especially persistent walls of teeths), cracks, cuts, attritions and traces of oiling. Replace defective components.

Taking an opportunity, at the same time make replacement of the water pump (see the Head of the Cooling system, heating).

INSTALLATION

 PERFORMANCE ORDER

1. If removed, establish into place a cogwheel of a camshaft and tighten a bolt of its fastening with the demanded effort.
2. Make sure that the engine on former remains in the provision VMT of the end of a step of compression of the first cylinder (see the Section Reduction of the Piston of the First Cylinder in the provision of the top dead point (TDP)).

3. Achieve combination of adjusting tags on cogwheels of distributive and cranked shaft with reciprocal tags on the engine block.

Tags from both parties of a pulley of a camshaft have to be combined with the top cut of a head of cylinders.

4. Make sure that the back balancing shaft is blocked by means of a bolt or a prutkovy key 6 x 100 mm. Throw with a gas-distributing belt cogwheels, moving in the direction counterclockwise in the following order: wheel of a cranked shaft, natyazhitel, water pump, camshaft wheel.

5. Weaken a nut of a natyazhitel, having provided a belt tension. Tighten a nut and establish a belt of the drive of balancing shaft (see the Section Removal, check of a state and installation of cogwheels and a belt of the drive of balancing shaft).
6. Adjust a tension of both belts (see the Section Removal, check of a state and installation of cogwheels and a belt of the drive of balancing shaft), turn a cranked shaft for a bolt of its pulley on two complete revolutions, again having stopped it in the provision VMT of the end of a step of compression of the piston of the first cylinder. Make sure that all adjusting tags returned to starting positions. Repeat adjustment of efforts of a tension of belts (see paragraph 5 of the Section Removal, check of a state and installation of cogwheels and a belt of the drive of balancing shaft).
7. Further installation is made as it should be, the return to an order of dismantle of components. At installation of a pulley of a cranked shaft do not forget to grease a carving and the lower surfaces of heads of bolts of its fastening.

Do not apply a shock key to a pulley bolt tightening.