Honda Accord

1998-1999 of release

Repair and operation of the car



Honda Chord
+ Cars of the Honda Accord brand
+ Settings and routine maintenance
- Engine
   - Four-cylinder engines
      Preparatory actions and the list of repair procedures which can be executed without extraction of the engine from the car
      Reduction of the piston of the first cylinder in the provision of the top dead point (TDP)
      Removal and installation of a cover of a head of cylinders
      VTEC system - the general information and check of a condition of components
      Removal, check of a state and installation of assembly of yokes
      Replacement of maslootrazhatelny caps and valvate springs with plates
      Removal and installation of the inlet pipeline
      Removal and installation of a final collector
      Removal, check of a state and installation of cogwheels and belt of the drive of balancing shaft
      Removal, check of a state and installation of a gas-distributing belt and cogwheels of the GRM drive
      Replacement of a forward epiploon of a cranked shaft
      Removal, check of a state and installation of a camshaft
      Removal and installation of a head of cylinders
      Removal and installation of the pallet of a case of the engine
      Removal, check of a state and installation of the oil pump
      Removal and installation of a flywheel / driving disk
      Replacement of a back epiploon of a cranked shaft
      Check of a state and replacement of support of a suspension bracket of the power unit
      System of correction of a suspension bracket of the power unit - the general information and check of serviceability of functioning
   + V6 Engines
   + General and capital repairs of the engine
+ Cooling systems, heating
+ Power supply system and release
+ Electric equipment of the engine
+ Engine management
+ gear shifting Box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schemes of electric equipment


Removal and installation of the inlet pipeline

It is worth to remember that gasoline is flammable liquid in the highest measure! At service of components of a power supply system observe all taken measures of fire safety. Does not smoke, do not come nearer to a venue of works with naked flame or the carrying unprotected by the lamp shade. Do not make service of system in the room equipped with the heating devices working at natural gas and equipped with a control torch (such as vodogre and dryers for clothes). Do not forget that gasoline is among the cancerogenic substances promoting development of a cancer-. try not to allow hits of fuel on open sites of a body. Use protective rubber gloves, at casual unforeseen contact carefully wash out hands warm water with soap. Immediately collect the spilled fuel and do not put the rags impregnated with fuels and lubricants near sources of naked flame. Remember that the power supply system of the models equipped with injection of fuel constantly is under pressure. Before starting a detachment of fuel lines, dump residual pressure in system (for more details see the Head of the Power supply system and release). At service of components of a power supply system put on goggles. Constantly hold near at hand the class B fire extinguisher!

REMOVAL

 PERFORMANCE ORDER

1. Dump pressure in a power supply system (see the Head of the Power supply system and release), then disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped with a security code before disconnecting the battery make sure that have the correct combination for input of the audio system in action!

2. Empty the cooling system (see the Head Nastroyki and routine maintenance).
3. Disconnect an inlet air duct from assembly of the air cleaner (see the Head of the Power supply system and release).
4. Having accurately marked, disconnect all the electrical wiring, and also vacuum lines disturbing to dismantle of the inlet pipeline.

5. Disconnect an accelerator cable from the throttle case cables of gas and a control system of the speed (tempostat) (see the Head of the Power supply system and release), - do not release cables from an arm, and only give bolts of fastening of the last.

6. Remove a thermostat casing from the inlet pipeline.

7. Disconnect from the fuel highway of the line of giving and return of fuel (see the Head of the Power supply system and release).

Pressure in system has to be dumped beforehand (see paragraph 1)!

8. Working under the car, remove the assembly bracket supporting the inlet pipeline, previously having separated from it an electrical wiring plait.

9. Turn out fixing bolts and remove the inlet pipeline from the engine.

The lower pipeline can be removed together with the delivery camera of an air path (the top pipeline) installed on it, however access to fixing bolts will significantly be facilitated if to remove a delivery chamber in advance.

INSTALLATION

 PERFORMANCE ORDER

1. Wipe solvent of a nut of fastening of the inlet pipeline, then carefully dry them (whenever possible with use of compressed air).

When using compressed air do not forget to put on goggles!

2. Estimate planeness of the interfaced pipeline surfaces by means of the special measuring instrument (the steel ruler put on an edge) and the probe of lezviyny type. Compare results of measurements to requirements of Specifications.
3. Before installation of the EGR valve clean it a small brush with solvent, having carefully removed all accumulated deposits.
4. Examine the pipeline on existence of cracks and signs of deformation. The defective pipeline is subject to a pro-point, or replacement.
5. Check a condition of fixture (bolts/hairpins) of the pipeline. Replace defective units.
6. Scratch out traces of material of old laying from the interfaced surfaces of a head and the inlet pipeline, then wipe surfaces the rags moistened in acetone.

7. Having picked up new sealing laying, install the pipeline on the regular place and fix it, having tightened all nuts by hand. Working in strictly certain order, tighten fixture with the demanded effort (see Specifications). If removed a delivery camera, install it on a place (do not forget to replace sealing laying).

8. Further installation is made as it should be, the return to a dismantle order. In summary do not forget to fill the cooling system (see the Head Nastroyki and routine maintenance).